Featured Projects
Explore our galleries of completed land development projects throughout the Lowcountry and beyond.
Featured Projects
Dorchester District Two Middle School Site
SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction. The 135,000 square feet building pad required chemical stabilization for on time delivery. Utility construction included 2,000 linear feet...
Carnes K8 Campus
The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District. Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities. Over 6 acres of...
Carnes Davis Apartments
The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community. Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...
Sanctuary Cove Phase 6
The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned community of Cane Bay Plantation in Summerville. The 20 acre project had site work broken into two phases with an early and final site package. SILD took...
Central Ave Townhomes
The Lennar Corporation selected SILD to perform the site work package for the 60 unit townhome development in Summerville. Several existing structures had to be demolished before excavation and grading work could begin. Due to site topography, 25,000 cubic yards of...
Founders Yard
The Founders Yard project is a 340+ unit multifamily complex on a 14 acre site located in West Ashley. CF Evans selected SILD as the site work subcontractor for the project. Major project accomplishments included the install of a Cultec underground stormwater...
CSU Science Building
SILD was selected as the site contractor for Charleston Southern University’s new Science & Engineering Building by Trident Construction. Site Photos
Claiborne at Brickyard Crossing
The Claiborne at Brickyard Crossing is a repurposed brick manufacturing site turned senior retirement living facility. SILD imported approximately 15,000 CY of structural fill to complete the 150,000 square foot building pad. Site Photos
Crescent Cove Villas
Crescent Cove Villas is a 15 acre townhome development located in Summerville, SC. SILD provided the sitework package that took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage for homebuilders to begin...
Grand Bees Amenity Center
The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool. Due to the poor soil conditions on this site, SILD grading crew mucked and filled all structural areas. Approximately 5,000 cubic yards of...
Limehouse Village Amenity Center
SILD was selected by Lennar Homes to complete the Limehouse Village Amenity Center site package. Site Photos
North Charleston Center for Advanced Studies
The 5 acre North Charleston Center for Advanced Studies campus was built adjacent to North Charleston High School. McKnight Construction hired SILD to complete the site package for this project. Highlights from this project include SILD grading crews fine graded and...
West Ashley High School Center for Advanced Studies
SILD was hired by Contract Construction to complete the site package for the new Center for Advanced Studies at West Ashley High School. Working on an active school campus required all land clearing and heavy earth moving work be completed during the summer vacation...
James Island Charter High School
MB Kahn selected SILD as the site work contractor for the CTE building and Competition Gym expansion on the existing James Island High School campus. This site was a challenge in that multiple previous school expansions created many unknown utility conflicts. SILD...
Jacksonboro Sand Mine
SILD opened the Jacksonboro Sand Mine in the Spring of 2021. Operating their own dirt pit allows SILD to meet tight deadlines and always give clients the most competitive pricing when possible. Approximately, 30,000 cubic yards of dirt was excavated within the first...
St. Andrew’s PSD Maintenance Facility
The St. Andrew’s PSD project was unique in that the site had been previously used as a wastewater treatment facility and a residential landfill. SILD worked closely with design engineers and the general contractor, Trident Construction, to ensure all unsuitable soils...
Summerville Stormwater Retention Pond
The Town of Summerville contracted SILD to create a new 2.6 acre stormwater pond. Clearing the heavily wooded site was done carefully and quickly to cause minimal disturbance to nearby residents. Approximately 38,000 cubic yards of dirt was removed to form the new...
Beech Hill Middle School
SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction. The 135,000 square feet building pad required chemical stabilization for on time delivery. Utility construction included 2,000 linear feet...
Crescent Cove
This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities. Site Photos
Benton House Addition
Site package for an addition to an existing elderly care facility located in West Ashley, SC. Scope included erosion control, demolition, removing topsoil, and building pad preparation.Site Photos
Caliber Collision Carolina Park
Site package for an automotive facility located in Mt. Pleasant, SC. Scope included erosion control, clearing, underground retention system, storm drainage, asphalt paving, and site concrete.Site Photos
Renau Boulevard Culvert
New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing roadway, pre cast structures, cast in place wing walls, and road construction.Site Photos
West Ashley Center for Advanced Studies
Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot construction, building pad, storm drainage, utilities, and site concrete. Site Photos
Ladson Elementary Fire Lane
SILD is the site contractor for this project located in Ladson, South Carolina. Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional sidewalks, storm drainage, and fire access road. Site Photos
Waterford Townhomes Phase 2B
SILD was the selected site contractor on this residential development. Worked consisted of clearing, preparing multiple home sites, water services, sewer services, storm drain, asphalt paving, and curb.Site Photos
North Rhett Storm Drain Improvements
SILD was the selected General Contractor for the North Rhett Drainage Improvements. The objective of this project was to provide a better drainage system at an active shipping facility. Some of the existing storm drain pipes and structures were no longer capable of...
Dupont Office Shell Building
SILD was the site contractor on this project located in West Ashley, South Carolina. Scope of work included converting and existing storage yard into a fully function office site. SILD installed the drainage system, including drain structures, pipe, and outfall pond....
Fins Carwash
SILD is the site contractor for this project located in West Ashley, South Carolina. This site was the previous home of a restaurant and laundromat, being converted into a carwash site. After demolition of existing facitilites, SILD installed new storm drainage, sewer...
CSU Drainage Improvements
SILD was the selected general contractor on this project, located on the campus of Charleston Southern University. The goal of this project was to increase drainage capacity of existing storm drain, while adding additional drainage to the campus. The existing 3 acre...
Baker Motor Parking Lot
SILD was a subcontractor on this project, hired to construct a parking lot for an automotive dealer. An underground retention system was installed in the parking lot, receiving the drainage from the new storm drain system. Associated work consisted of installing curb...
Camp Road Middle School – Early Site Package
SILD was a subcontractor, performing the site package, for a local general contractor. This project consisted of demolition of an existing campus, to construct the new Camp Road Middle School. Work consisted of mass grading the existing campus to prepare for the new...
West Ashley Library
This is a current project, where SILD is the selected site contractor. The site package consists of clearing and grubbing an existing tract. Removing several thousand cubic yards of unsuitable soils, and replacing these soils with structurally sound fill. A new...
Mercedes Benz Marshalling Yard – Storm Drain
SILD was a subcontractor on this project, hired to install storm drainage. Scope of work included installing large diameter reinforced concrete pipe, inside existing outfall ditches. Requiring several large excavators, and wheel loaders to deliver on schedule....
St. Andrews Church Expansion
This is a current project SILD is the site contractor for a local general contractor. This project is an expansion of an existing church in Mt. Pleasant, South Carolina. Work consists of removing existing trees, utilizing arborists and large excavators, to safely...
Brighton Park Commercial Ponds
SILD was the selected general contractor for this project, located in Nexton, South Carolina. This project was an early site package for a commercial property, where the objective was to provide additional drainage and earthwork for a 9 acre site. An existing storm...
Cane Bay YMCA – Storm Drain
SILD was a subcontractor on this project, hired to install storm drainage. This project consisted of constructing a new recreation facility in the Cane Bay development. This was new drainage install consisting of over a mile of drainage pipe and 65 drainage...
Moultrie Middle School Addition
This is a current project, where SILD is the site contractor. This is a construction addition of an existing middle school in Mt. Pleasant, South Carolina. The earthwork consisted of prepping building pads for several additions around the campus. As well as, removing...
In The News
Live5 News
James Island Charter High Projects total $27 million investment
SAPSD News
Live5 News
CSU News
Live5 News
Live5 News
Mercedes-Benz
News2
News2
Post and Courier
Nexton development expected to accelerate after new I-26 interchange opens in 2018
Moultrie News
Contact us to
begin your project
Sea Island Land Development is a trusted Charleston-based business to meet your project's land development needs.