The St. Andrew’s PSD project was unique in that the site had been previously used as a wastewater treatment facility and a residential landfill. SILD worked closely with design engineers and the general contractor, Trident Construction, to ensure all unsuitable soils were removed from structural areas. Overall, 11,000 cubic yards of unsuitable soils were excavated and replaced structurally sound fill material.

GBT Carnes
Sea Island Land Development (SILD) is proud to have been selected by Samet Corporation to lead the site development for the GBT Carnes apartment complex in Summerville, South Carolina. Our team is responsible for managing the full scope of mass earthwork, underground...