SILD - Sea Island Land Development

Home

Services

Projects

Giving Back

Careers

Contact

Services

Storm Drainage

Water Runoff, Managed

In the Lowcountry, flooding and storm drainage is always a concern on any job. A typical storm drain install includes catch basins, to receive the runoff, and a storm drain pipe is installed to carry the water to a retention pond. We also install non conventional storm water management systems, such as underground retention systems and tidal check valves.
Carnes K8 Campus

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...

read more
Carnes Davis Apartments

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15-acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on-time delivery. ...

read more
Sanctuary Cove Phase 6

Sanctuary Cove Phase 6

The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned community of Cane Bay Plantation in Summerville.  The 20 acre project had site work broken into two phases with an early and final site package.  SILD took...

read more
Central Ave Townhomes

Central Ave Townhomes

The Lennar Corporation selected SILD to perform the site work package for the 60 unit townhome development in Summerville. Several existing structures had to be demolished before excavation and grading work could begin. Due to site topography, 25,000 cubic yards of...

read more
Founders Yard

Founders Yard

The Founders Yard project is a 340+ unit multifamily complex on a 14 acre site located in West Ashley. CF Evans selected SILD as the site work subcontractor for the project. Major project accomplishments included the install of a Cultec underground stormwater...

read more
CSU Science Building

CSU Science Building

SILD was selected as the site contractor for Charleston Southern University’s new Science & Engineering Building by Trident Construction.

read more
Claiborne at Brickyard Crossing

Claiborne at Brickyard Crossing

The Claiborne at Brickyard Crossing is a repurposed brick manufacturing site turned senior retirement living facility.  SILD imported approximately 15,000 CY of structural fill to complete the 150,000 square foot building pad.

read more
Crescent Cove Villas

Crescent Cove Villas

Crescent Cove Villas is a 15 acre townhome development located in Summerville, SC.  SILD provided the sitework package that took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage for homebuilders to begin...

read more
Grand Bees Amenity Center

Grand Bees Amenity Center

The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.  Due to the poor soil conditions on this site, SILD grading crew mucked and filled all structural areas.  Approximately 5,000 cubic yards of...

read more
North Charleston Center for Advanced Studies

North Charleston Center for Advanced Studies

The 5 acre North Charleston Center for Advanced Studies campus was built adjacent to North Charleston High School.  McKnight Construction hired SILD to complete the site package for this project.  Highlights from this project include SILD grading crews fine graded and...

read more
West Ashley High School Center for Advanced Studies

West Ashley High School Center for Advanced Studies

SILD was hired by Contract Construction to complete the site package for the new Center for Advanced Studies at West Ashley High School.  Working on an active school campus required all land clearing and heavy earth-moving work be completed during the summer vacation...

read more
James Island Charter High School

James Island Charter High School

MB Kahn selected SILD as the site work contractor for the CTE building and Competition Gym expansion on the existing James Island High School campus.  This site was a challenge in that multiple previous school expansions created many unknown utility conflicts.  SILD...

read more
St. Andrew’s PSD Maintenance Facility

St. Andrew’s PSD Maintenance Facility

The St. Andrew’s PSD project was unique in that the site had been previously used as a wastewater treatment facility and a residential landfill.  SILD worked closely with design engineers and the general contractor, Trident Construction, to ensure all unsuitable soils...

read more
Summerville Stormwater Retention Pond

Summerville Stormwater Retention Pond

The Town of Summerville contracted SILD to create a new 2.6 acre stormwater pond. Clearing the heavily wooded site was done carefully and quickly to cause minimal disturbance to nearby residents. Approximately 38,000 cubic yards of dirt was removed to form the new...

read more
Beech Hill Middle School

Beech Hill Middle School

SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.  The 135,000 square feet building pad required chemical stabilization for on time delivery.  Utility construction included 2,000 linear feet...

read more
Benton House Addition

Benton House Addition

Site package for an addition to an existing elderly care facility located in West Ashley, SC. Scope included erosion control, demolition, removing topsoil, and building pad preparation.

read more

Recent Projects

Nexton Hammocks Amenity

Nexton Hammocks Amenity

Sea Island Land Development (SILD) is proud to have been selected by Brookfield Properties to construct the Amenity Center within the Hammocks Walk community. This project encompassed a wide range of site development services, including precision earthwork grading,...

Dorchester District Two Middle School Site

Dorchester District Two Middle School Site

SILD was selected by Thompson Turner Construction as the site contractor for the development of the 20-acre East Edisto Middle School campus. This project involved extensive site preparation to accommodate the new 135,000-square-foot school building, including...

Carnes K8 Campus

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...