SILD was the selected general contractor on this project, located on the campus of Charleston Southern University. The goal of this project was to increase drainage capacity of existing storm drain, while adding additional drainage to the campus. The existing 3 acre drainage lake, had to be lowered several feet in elevation, to deepen the lake. While raising the sides and surrounding areas, to increase volume. The entire lake had to be pumped dry, while storm drain flow was diverted by pumps, and the lake was excavated per plan. A new earthen dam was constructed at the upper end of the lake, with new outfall structures on both sides of the lake.  An additional drainage pond was added by the softball facility, and additional drainage was installed to connect the new pond. Utility work consisted of relocating water services, coordinating gas main deflections, bypasses, and relocating telecommunication. The campus water main was shut down, removed, and reinstalled at a lower elevation, to allow the new drainage system to connect to existing drainage. 

CSU Health Science Building Expansion

Charleston Southern University officially broke ground for an additional Health Science building on January 28, 2019. The 13,272-square-foot building is an expansion to the first Health Science building (built in 2017 and opened in 2018) to accommodate the growing Health Science programs at CSU, including the future Doctor of Physical Therapy.

“The expansion allows CSU to continue growing our rigorous health science programs and prepare graduates with advanced skills as they serve the Lowcountry and beyond,” said Dr. Scott Yarbrough, Assistant Vice President for Academic Affairs for Compliance and Student Success. The building expansion will include several student and research labs, as well as study rooms, offices and a lounge. CSU expects to complete the project by the end of December 2019.

Services

Location

CSU Drainage Improvements

Site Photography

More Recently Completed Projects

Long Savanna

Long Savanna

Sea Island Land Development (SILD) was selected by Pulte Home Company to perform the complete site development for Long Savannah, a new 14.15-acre residential community located in the City of Charleston, South Carolina. The project will include the development of 69...

Stono Edge Ditch

Stono Edge Ditch

Sea Island Land Development (SILD) was selected by Charleston County to complete drainage improvements for the Stono Edge Ditch project on James Island, South Carolina. The project includes approximately 1,100 linear feet of ditch clearing and regrading designed to...

Roper Sawmill

Roper Sawmill

Sea Island Land Development (SILD) was selected by Trident Construction to complete the site development for the new Roper Sawmill medical office building in Summerville, South Carolina. Developed by BGMP Development LLC, this 2.81-acre commercial project will expand...

MUSC FSER

MUSC FSER

Sea Island Land Development (SILD) was selected by MB Kahn (General Contractor) to perform the complete sitework, water and sewer utilities, and storm drainage installation for the new MUSC 24-Hour Free-Standing Emergency Room (FSER) in West Ashley, adjacent to...

Sol Legare Road

Sol Legare Road

Sea Island Land Development (SILD) was selected by Charleston County to complete roadway improvements on Sol Legare Road on James Island, transforming approximately ¼ mile of existing dirt roadway into a paved surface. This project features a unique pervious paving...

Roper Sawmill

Roper Sawmill

Sea Island Land Development (SILD) was selected by Trident Construction to complete the site development for the new Roper Sawmill medical office building in Summerville, South Carolina. Developed by BGMP Development LLC, this 2.81-acre commercial project will expand...

MUSC FSER

MUSC FSER

Sea Island Land Development (SILD) was selected by MB Kahn (General Contractor) to perform the complete sitework, water and sewer utilities, and storm drainage installation for the new MUSC 24-Hour Free-Standing Emergency Room (FSER) in West Ashley, adjacent to...

Sol Legare Road

Sol Legare Road

Sea Island Land Development (SILD) was selected by Charleston County to complete roadway improvements on Sol Legare Road on James Island, transforming approximately ¼ mile of existing dirt roadway into a paved surface. This project features a unique pervious paving...

South Rail

South Rail

Sea Island Land Development (SILD) is proud to partner with ARCO on the Southrail commercial development, an 11-acre site located in North Charleston, South Carolina. This project will feature a 145,000-square-foot warehouse facility, supporting continued industrial...

The Grove

The Grove

Sea Island Land Development (SILD) was selected by Lennar Carolinas to perform full sitework for The Grove at Cane Bay, a 26-acre residential development located in Berkeley County, South Carolina. This project will bring 210 new single-family townhomes to one of the...

Woodfield Nexton Townhomes

Woodfield Nexton Townhomes

Sea Island Land Development (SILD) is proud to have completed the site construction for Woodfield Nexton Townhomes, developed by Woodfield Development, LLC, and located in Downtown Nexton in the Town of Summerville, South Carolina. This 8-acre, 114-unit multi-family...

Tri-County Bio Labs

Tri-County Bio Labs

Sea Island Land Development (SILD) was selected by Contract Construction to complete the full site construction for the Tri County Biological Science Center. The project involved comprehensive civil and site preparation work, beginning with clearing and grubbing and...

Carnes Active Adult

Carnes Active Adult

Sea Island Land Development (SILD) was selected by Lennar Carolinas to complete sitework for Phase 4 of the Carnes Crossroads Active Adult community in Goose Creek, South Carolina. This 25-acre residential project will deliver 68 new single-family homes designed...

Contact us to
begin your project

Sea Island Land Development is a trusted Charleston-based business to meet your project's land development needs.