SILD - Sea Island Land Development

Home

Services

Projects

Giving Back

Careers

Contact

Featured Project

West Ashley Library

SILD Field Notes

This is a current project, where SILD is the selected site contractor. The site package consists of clearing and grubbing an existing tract. Removing several thousand cubic yards of unsuitable soils, and replacing these soils with structurally sound fill. A new drainage system including retention pond, outfall structures, curb inlets, yard inlets, reinforced concrete pipe, and roof drain system. A new sewer line was extended into the project, as well as domestic and fire water services. Hardscape includes curb, heavy duty concrete, sidewalks, and pavers.

 

Groundbreaking for new West Ashley Library 

Charleston County residents will soon have a new place to pick up their favorite reading materials as officials broke ground on a new Bees Ferry West Ashley branch on Tuesday morning. The 20,000-square-foot facility will be located off Glenn McConnell Parkway near West Ashley High school.

It will include an auditorium that can seat 100 people, a small meeting room, two group study rooms, an instructional room with 10 computer stations, a storytime room in the children’s area, a family restroom and a nursing room will also be available. It’s scheduled to open in 2020.

Site Photos

More Recently Completed Projects

Dorchester District Two Middle School Site

Dorchester District Two Middle School Site

SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction.  The 135,000 square feet building pad required chemical stabilization for on time delivery.  Utility construction included 2,000 linear feet...

read more
Carnes K8 Campus

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...

read more
Carnes Davis Apartments

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...

read more
Sanctuary Cove Phase 6

Sanctuary Cove Phase 6

The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned community of Cane Bay Plantation in Summerville.  The 20 acre project had site work broken into two phases with an early and final site package.  SILD took...

read more
Central Ave Townhomes

Central Ave Townhomes

The Lennar Corporation selected SILD to perform the site work package for the 60 unit townhome development in Summerville. Several existing structures had to be demolished before excavation and grading work could begin. Due to site topography, 25,000 cubic yards of...

read more
Carnes Davis Apartments

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...

read more
Sanctuary Cove Phase 6

Sanctuary Cove Phase 6

The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned community of Cane Bay Plantation in Summerville.  The 20 acre project had site work broken into two phases with an early and final site package.  SILD took...

read more
Central Ave Townhomes

Central Ave Townhomes

The Lennar Corporation selected SILD to perform the site work package for the 60 unit townhome development in Summerville. Several existing structures had to be demolished before excavation and grading work could begin. Due to site topography, 25,000 cubic yards of...

read more
Founders Yard

Founders Yard

The Founders Yard project is a 340+ unit multifamily complex on a 14 acre site located in West Ashley. CF Evans selected SILD as the site work subcontractor for the project. Major project accomplishments included the install of a Cultec underground stormwater...

read more
Crescent Cove Villas

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

read more

Contact us to
begin your project

Sea Island Land Development is trusted Charleston-based business to meet your project's land development needs.