SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction. The 135,000 square feet building pad required chemical stabilization for on time delivery. Utility construction included 2,000 linear feet of deep gravity sewer and 8” water main. Over 1 mile of reinforced concrete storm drain pipe was placed to provide adequate drainage. Additional challenges of the project included wetland road crossings and bridge construction.
MUSC FSER
Sea Island Land Development (SILD) was selected by MB Kahn (General Contractor) to perform the complete sitework, water and sewer utilities, and storm drainage installation for the new MUSC 24-Hour Free-Standing Emergency Room (FSER) in West Ashley, adjacent to...