SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction. The 135,000 square feet building pad required chemical stabilization for on time delivery. Utility construction included 2,000 linear feet...
Public Utilities
GO WITH THE FLOW
Sanctuary Cove Phase 6
The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned community of Cane Bay Plantation in Summerville. The 20 acre project had site work broken into two phases with an early and final site package. SILD took...
Central Ave Townhomes
The Lennar Corporation selected SILD to perform the site work package for the 60 unit townhome development in Summerville. Several existing structures had to be demolished before excavation and grading work could begin. Due to site topography, 25,000 cubic yards of...
Claiborne at Brickyard Crossing
SILD imported approximately 15,000 CY of structural fill to complete the 150,000 square foot building pad.
Crescent Cove Villas
SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.
Grand Bees Amenity Center
The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.
Limehouse Village Amenity Center
SILD was selected by Lennar Homes to complete the Limehouse Village Amenity Center site package.
North Charleston Center for Advanced Studies
Highlights from this project include SILD grading crews fine graded and paved 7,000 square yards within a week to meet the owner’s tight deadline.
West Ashley High School Center for Advanced Studies
Working on an active school campus required all land clearing and heavy earth moving work be completed during the summer vacation period.
James Island Charter High School
This site was a challenge in that multiple previous school expansions created many unknown utility conflicts.
Beech Hill Middle School
SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.
Crescent Cove
This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities.
Caliber Collision Carolina Park
Site package for an automotive faciltiy located in Mt. Pleasant, SC. Scope included erosion control, clearing, underground retention system, storm drainage, asphalt paving, and site concrete.
Renau Boulevard Culvert
New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing roadway, pre cast structures, cast in place wing walls, and road construction.
West Ashley Center for Advanced Studies
Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot construction, building pad, storm drainage, utilities, and site concrete.
Ladson Elementary Fire Lane
Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional sidewalks, storm drainage, and fire access road.
Waterford Townhomes Phase 2B
SILD was the selected site contractor on this residential development. Worked consisted of clearing, preparing multiple home sites, water services, sewer services, storm drain, asphalt paving, and curb.
Fins Carwash
This site was the previous home of a restaurant and laundromat, being converted into a carwash site. After demolition of existing facitilites, SILD installed new storm drainage, sewer service, and water service.
West Ashley Library
The site package consists of clearing and grubbing an existing tract. Removing several thousand cubic yards of unsuitable soils, and replacing these soils with structurally sound fill.
Moultrie Middle School Addition
This is a construction addition of an existing middle school in Mt. Pleasant, South Carolina. The earthwork consisted of prepping building pads for several additions around the campus.
Recent Projects
Dorchester District Two Middle School Site
SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction. The 135,000 square feet building pad required chemical stabilization for on time delivery. Utility construction included 2,000 linear feet...
Carnes K8 Campus
The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District. Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities. Over 6 acres of...
Carnes Davis Apartments
The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community. Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...