Jacksonboro Sand Mine

Jacksonboro Sand Mine

SILD opened the Jacksonboro Sand Mine in the Spring of 2021.  Operating their own dirt pit allows SILD to meet tight deadlines and always give clients the most competitive pricing when possible.  Approximately, 30,000 cubic yards of dirt was excavated within the first...
St. Andrew’s PSD Maintenance Facility

St. Andrew’s PSD Maintenance Facility

The St. Andrew’s PSD project was unique in that the site had been previously used as a wastewater treatment facility and a residential landfill.  SILD worked closely with design engineers and the general contractor, Trident Construction, to ensure all unsuitable soils...
Summerville Stormwater Retention Pond

Summerville Stormwater Retention Pond

The Town of Summerville contracted SILD to create a new 2.6 acre stormwater pond. Clearing the heavily wooded site was done carefully and quickly to cause minimal disturbance to nearby residents. Approximately 38,000 cubic yards of dirt was removed to form the new...
Beech Hill Middle School

Beech Hill Middle School

SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.  The 135,000 square feet building pad required chemical stabilization for on time delivery.  Utility construction included 2,000 linear feet...
Benton House Addition

Benton House Addition

Site package for an addition to an existing elderly care facility located in West Ashley, SC. Scope included erosion control, demolition, removing topsoil, and building pad...