The Lennar Corporation selected SILD to perform the site work package for the 60 unit townhome development in Summerville. Several existing structures had to be demolished before excavation and grading work could begin. Due to site topography, 25,000 cubic yards of dirt was excavated and exported offsite. SILD pipe crews installed storm drainage, water and sewer utilities.
Dorchester District Two Middle School Site
SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction. The 135,000 square feet building pad required chemical stabilization for on time delivery. Utility construction included 2,000 linear feet...