SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction. The 135,000 square feet building pad required chemical stabilization for on time delivery. Utility construction included 2,000 linear feet...
Grading
ON THE LEVEL
Sanctuary Cove Phase 6
The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned community of Cane Bay Plantation in Summerville. The 20 acre project had site work broken into two phases with an early and final site package. SILD took...
CSU Science Building
SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.
Claiborne at Brickyard Crossing
SILD imported approximately 15,000 CY of structural fill to complete the 150,000 square foot building pad.
Crescent Cove Villas
SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.
Grand Bees Amenity Center
The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.
Limehouse Village Amenity Center
SILD was selected by Lennar Homes to complete the Limehouse Village Amenity Center site package.
North Charleston Center for Advanced Studies
Highlights from this project include SILD grading crews fine graded and paved 7,000 square yards within a week to meet the owner’s tight deadline.
West Ashley High School Center for Advanced Studies
Working on an active school campus required all land clearing and heavy earth moving work be completed during the summer vacation period.
James Island Charter High School
This site was a challenge in that multiple previous school expansions created many unknown utility conflicts.
St. Andrew’s PSD Maintenance Facility
The St. Andrew’s PSD project was unique in that the site had been previously used as a wastewater treatment facility and a residential landfill.
Beech Hill Middle School
SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.
Crescent Cove
This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities.
Benton House Addition
Site package for an addition to an existing elderly care facility located in West Ashley, SC. Scope included erosion control, demolition, removing topsoil, and building pad preparation.
Caliber Collision Carolina Park
Site package for an automotive faciltiy located in Mt. Pleasant, SC. Scope included erosion control, clearing, underground retention system, storm drainage, asphalt paving, and site concrete.
Renau Boulevard Culvert
New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing roadway, pre cast structures, cast in place wing walls, and road construction.
West Ashley Center for Advanced Studies
Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot construction, building pad, storm drainage, utilities, and site concrete.
Ladson Elementary Fire Lane
Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional sidewalks, storm drainage, and fire access road.
Fins Carwash
This site was the previous home of a restaurant and laundromat, being converted into a carwash site. After demolition of existing facitilites, SILD installed new storm drainage, sewer service, and water service.
CSU Drainage Improvements
The goal of this project was to increase drainage capacity of existing storm drain, while adding additional drainage to the campus. The existing 3 acre drainage lake, had to be lowered several feet in elevation, to deepen the lake.
Recent Projects
Dorchester District Two Middle School Site
SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction. The 135,000 square feet building pad required chemical stabilization for on time delivery. Utility construction included 2,000 linear feet...
Carnes K8 Campus
The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District. Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities. Over 6 acres of...
Carnes Davis Apartments
The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community. Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...