ON THE LEVEL

The grading process starts by utilizing Topcon GPS Equipment to establish lines and grades. With fully integrated GPS equipment, the machines on capable of cutting and filling to grade automatically. Utilizing state of the art equipment and technology, SILD can transform the land from a wooded lot to a landscaped site.

Dorchester District Two Middle School Site

SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction.  The 135,000 square feet building pad required chemical stabilization for on time delivery.  Utility construction included 2,000 linear feet...

Sanctuary Cove Phase 6

The Pulte Group selected SILD for the sixth phase of their housing development located within the master planned community of Cane Bay Plantation in Summerville.  The 20 acre project had site work broken into two phases with an early and final site package.  SILD took...

CSU Science Building

SILD was selected as the site contractor for CSU’s new Science & Engineering Building by Trident Construction.

Crescent Cove Villas

SILD took the heavily wooded tract to 60 completed building pads with necessary roads, utilities and drainage to begin construction.

Grand Bees Amenity Center

The Grand Bees community by Lennar Homes features an 2.5 acre amenity center complete with a junior size olympic swimming pool.

Beech Hill Middle School

SILD was selected as the site contractor for the new 20 acre Beech Hill Middle School Campus by Thompson Turner Construction.

Crescent Cove

This project is a turn key site development located in Summerville, SC. Scope consists of clearing, grading, building pads, roadways, and utilities. 

Benton House Addition

Site package for an addition to an existing elderly care facility located in West Ashley, SC. Scope included erosion control, demolition, removing topsoil, and building pad preparation.

Caliber Collision Carolina Park

Site package for an automotive faciltiy located in Mt. Pleasant, SC. Scope included erosion control, clearing, underground retention system, storm drainage, asphalt paving, and site concrete.

Renau Boulevard Culvert

New box culvert construction in Summerville, SC. Work consisted of bypassing freshwater stream, removing existing roadway, pre cast structures, cast in place wing walls, and road construction.

West Ashley Center for Advanced Studies

Site package for a new education facility located in West Ashley, SC. Work consists of mass grading, parking lot construction, building pad, storm drainage, utilities, and site concrete.

Ladson Elementary Fire Lane

Site improvements project on the campus of Ladson Elementary School. Consisting of demolition, additional sidewalks, storm drainage, and fire access road.

Fins Carwash

This site was the previous home of a restaurant and laundromat, being converted into a carwash site. After demolition of existing facitilites, SILD installed new storm drainage, sewer service, and water service.

CSU Drainage Improvements

The goal of this project was to increase drainage capacity of existing storm drain, while adding additional drainage to the campus. The existing 3 acre drainage lake, had to be lowered several feet in elevation, to deepen the lake.

Recent Projects

Dorchester District Two Middle School Site

SILD was selected as the site contractor for the new 20 acre East Edisto Middle School Campus by Thompson Turner Construction.  The 135,000 square feet building pad required chemical stabilization for on time delivery.  Utility construction included 2,000 linear feet...

Carnes K8 Campus

The Carnes K8 project is a 40 acre education campus constructed by Edcon for the Berkeley County School District.  Site work package included earthwork for a 100,000 square foot building pad and athletic fields as well as water and sewer utilities.  Over 6 acres of...

Carnes Davis Apartments

The Davis Development team selected SILD as the sitework contractor for their 15 acre multifamily project located in the Carnes Crossroads community.  Due to onsite soil conditions chemical stabilization of building pads and roadways was key for on time delivery. ...